References

References

Numerous successful projects demonstrate our company’s expertise and reliability. Our references include industrial production halls, warehouse complexes, office buildings, bank facilities, cultural and educational institutions, as well as residential property developments.

Technical inspection

Independent and thorough technical supervision.

Construction project management

Full-scope construction project management

Contact

Have a question? Feel free to write or call us!

Ongoing projects

Condominium construction
Budapest 13th district, Angol street
WEERTS Logistic Parks
new warehouse construction
BIOFUNGI
factory expansion, Áporka
„VÍG” Theatre Budapest XVIII
set construction base
EUROCHAMP,
site development, Ócsa
RHEINMETALL,
plant construction, Szeged
RaktárAD, Vecsés
„R6” warehouses construction
RaktárAD, Alsónémedi
„H” warehouse construction
“VÍG” Theatre, Budapest XIII
performance space construction
LOTTE Infracell Hungary, Környe
water purification plant
IGPark, Kecskemét
new warehouse construction
IGPark, Kecskemét
extension of logistics hall
GSK, Gödöllő
solar-powered parking area construction

Previous projects

We approach every project as a new opportunity to prove our commitment and reliability.
Below is a selection of some of our key projects, presented as a brief overview rather than a complete list.

  • WEERTS Logistic Parks – Warehouse Construction Phase I – Ebes

    As part of the investment by WEERTS Logistic Parks (WLP), a new greenfield production and warehouse facility was built in Ebes, near the Debrecen South junction of the M35 motorway. In the first phase, a building with a total floor area of approximately 22,000 m² was constructed, featuring a precast reinforced concrete frame structure. The facility includes two identical 11,000 m² leasable warehouse spaces, each with its own two-story office and social block. The building is equipped with a sprinkler fire protection system, modern loading units, electric vehicle chargers, and spacious exterior loading and parking areas. The development was awarded a BREEAM Excellent certification.

    Location: Vecsés
    Year of completion: 2025
    Value (net): 6.500 million HUF
    Abéta, as: technical supervisor and HSE coordinator

    Click on the image to open the gallery

  • LOTTE Infracell Hungary – Aluminium Foil Manufacturing Plant Phase 2

    The production hall and technological support buildings of the Korean LOTTE ALUMINIUM factory, built in the Tatabánya Industrial Park in 2021, were expanded with a capacity-increasing development. The approximately 22,000 m2 hall expansion has the same precast reinforced concrete and composite on-site concrete structure as the previous one, and the additional buildings were partly made with reinforced concrete and partly with steel frame structures. Two additional rolling mills were installed in the new two-story hall section. The general contractor of the project was TAKENAKA.

    Location: Tatabánya Industrial Park – Környe
    Year of completion: 2024
    Value (net): 7.500 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • MAGNA Manufacturing Plant – Vecsés

    A new manufacturing facility was built on the outskirts of Vecsés, near the M0 motorway and the airport, as part of the WEERTS Logistic Parks (WLP) investment. The building has a total area of approximately 42,000 sq.m., with a prefabricated reinforced concrete frame structure. The manufacturing area is 37,500 sq.m., while the office and social spaces occupy 4,500 sq.m. The building consists of two sections with different heights, according to the requirements of the technology. The building, equipped with high-level mechanical and technological networks, will become the new site of the MAGNA Body & Chassis Hungary Kft. factory operating in the automotive industry.

    Locaton: Vecsés – WLP
    Year of completion: 2024
    Value (net): 9.600 million HUF
    Abéta, as: technical supervisor and HSE coordinator

    Click on the image to open the gallery

  • Kecskemét South Industrial Park – InfoGroup

    The new production hall of MOBIS Hungary Ltd., which produces automotive parts, was built in the second phase of InfoGroup’s development in the area of Kecskemét South Industrial Park. The total built-up area is 14.600 m2, the production hall is 12.700 m2, while the supporting areas and office rooms occupy 1.900 m2. The building has a reinforced concrete frame, is insulated, heated, ventilated, air-conditioned in the office areas, equipped with fire alarms and sprinkler extinguishing systems. The general contractor of the project is PALLÉR Csarnok Ltd.

    Locaton: Kecskemét
    Year of completion: 2024
    Value (net): 1.600 mFt million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • GROUPAMA ARENA – installation of solar panels to the roof of the sport center

    1350 solar panels were placed on the top of the FTC’s (leader club in Hungarian football championship) most important sports facility, the Groupama Arena located in Üllői street Budapest. The solar panels on the curved roof surface were placed so that the gaps between the panels show the inscription “FTC” to aircraft flying in the air corridor above the object.

    Locaton: Budapest IX. district
    Year of completion: 2024
    Value (net): 200 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • DECORATION & DESIGN extension of storage hall

    Expanding the warehouse of the company, which sells flower binding and decorative products, is an insulated warehouse with 1600 m2, using a reinforced concrete structure. The storage in warehouse is done a ‘high shelf system’, so the floor flatness has a high precision.

    Locaton: Szigetszentmikós
    Year of completion: 2024
    Value (net): 190 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • LOTTE Chemicals expansion of the production and storage hall with an office block

    The expansion of the production hall of the LOTTE Chemicals factory building (built in phase II.) in the Tatabánya Industrial Park with a new production and storage hall with a reinforced concrete skeleton. A steel support structure was also established inside the building for the plant technology, the ground-floor wing attached to the building houses offices and a social block. The total built-up area is 2580 m2.

    Locaton: Környe
    Year of completion: 2024
    Value (net): 1200 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new production hall for GIANT by TOBROCO

    The Dutch-owned company that manufactures parts for heavy machinery has moved its site from Eger to Füzesabony. The new, green field investment is one of the first projects of the Füzesabony Industrial Park. The production hall, with a reinforced concrete frame, has a floor area of 8,000 m2, including a 1,500 m2, two-storey office and social block. The air handling system that supplies the entire production hall provides tempered temperatures in all seasons. Energy efficiency is supported by the small solar power plant installed on the roof. The project includes complete utilities and the construction of a new road plus parking lot, as well as gardening works.

    Locaton: Füzesabony
    Year of completion: 2022
    Value (net): 1700 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • SANGSIN factory expansion

    The Korean SANGSIN Hungary Ltd. expanded its production hall in Jászberény with two building blocks with a total floor area of approximately 4,100 m2. In one of them, production lines and service technologies were installed to expand production capacity, and in the other, an automated warehousing system was built. Both blocks are thermally insulated hall structures with a reinforced concrete skeleton, the mechanical and electrical systems of which have been implemented by expanding the existing networks. The warehouse expansion received a sprinkler extinguishing system.

    Locaton: Jászberény
    Year of completion: 2025
    Value (net): 1700 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new high-bay warehouse for TRANS-SPED

    A new, 6700 m2 reinforced concrete high-bay warehouse was built on the logistics base of ‘TRANS-SPED’ Ltd., which opened in 2016. The design for an automated, high-shelf warehouse required an extremely flat-precision, sanded industrial floor structure to meet the challenges of the rapidly evolving warehousing technology. The fire safety of the building and the stored products are ensured by an aspiration fire alarm and sprinkler extinguishing system. The building was also equipped with the office and social space required for operation.

    Locaton: Környe
    Year of completion: 2022
    Value (net): 1900 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • The reconstruction of the new building of the Hungarian National Bank

    Reconstruction of the building of the former TELEKOM headquarters on Krisztina Boulevard in the 1st district of Budapest in accordance with the unique needs of the Hungarian National Bank (MNB) and the Budapest Stock Exchange (BÉT). The 20,000 m2 main building consists of four blocks, has 5-storeys and partial basement, and is complemented by a restaurant block and a multi-storey underground garage. The imposing roof-covered atrium of the main building opens onto a spacious conference room with state-of-the-art audio and video equipment. The design of the reconstruction was prepared by V4R Ltd., the main contractor of the reconstruction was RAW Development Ltd.

    Locaton: Budapest, 1st district
    Year of completion: 2022
    Value (net): 15 000 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Reconstructionof the 3rd floor of The Constitutional Court of Hungary

    The 3rd floor of the building has been completely rebuilt. Following the complete demolition of the internal masonry, cladding, and mechanical and electrical wiring, a new, modern kitchen, restaurant and café were built. A new multifunctional meeting and conference room with state-of-the-art audiovisual equipment and customizable furniture have also been established. Moreover, a new and modern three-room office block was built on the floor. The plans were designed by GINGKO Architects.

    Locaton: Budapest 1st district
    Year of completion: 2021
    Value (net): 530 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • LOTTE aluminium foil factory

    As a Korean greenfield investment, a 16,000 sqm factory producing aluminium foil for battery production was established. SAMSUNG Engineering was the general contractor for the complete unit of the prefabricated and on-site reinforced concrete frame, two-story manufacturing and warehousing hall, as well as the separate office block and other buildings, structures, roads, and parking lots.

    Locaton: Környe, the industrial park of Tatabánya
    Year of completion: 2021
    Value (net): 6500 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of NOVOPOLMA warehouse and office building

    A new warehouse and an office building have been established for the auto parts trading company. The supporting structure of the warehouse building is a set of steel lattice girders resting on reinforced concrete pillars, while the two-storey main building is made of classic reinforced concrete frames with infill brick masonry. The main building contains offices with sophisticated interior design and a sales area for the public.

    Locaton: Budapest, 20th district
    Year of completion: 2021
    Value (net): 500 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Church of Togetherness (Makovecz)

    The draft plans of the Protestant Church in Mátyás király square in Pesterzsébet were made by the Kossuth and Ybl award-winning architect, Imre Makovecz shortly before his death. The permitting and construction plans of the building, which consists of the church itself, a congregation hall and a vicarage, were prepared by architect Tamás Dósa-Papp. The reinforced concrete and brick walls of the building support a multi-curved, glue-laminated timber (GLT) structure that rests on the loadbearing walls.

    Locaton: Budapest, 20th district
    Year of completion: 2021
    Value (net): 730 million HUF
    Abéta, as: construction manager and technical supervisor

    Click on the image to open the gallery

  • XL warehouse

    A new, 35,000 m2 reinforced concrete warehouse was built in the industrial park of Nagytarcsa. The warehouse and the internal two-storey office space will be utilized by the investor through leasing. The contractor is GOLDBECK Ltd.

    Locaton: Nagytarcsa
    Year of completion: 2021
    Value (net): 8800 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • DANIELLA warehouse and office building

    A new, 12,000 m2 reinforced concrete logistics center has been established in the Nagytarcsa Industrial Park as the center of the wholesale activity of DANIELLA Ltd. The high-bay warehouse is complemented by a two-story office and social block. The contractor is GOLBECK Ltd.

    Locaton: Nagytarcsa
    Year of completion: 2020
    Value (net): 3200 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Energy renovation of the building of The Constitutional Court of Hungary

    Subsequent insulation of the facades of the building and replacement of the windows and doors of the front with the installation of external motorized blinds. The complete technical supervision tasks and the implementation of the renovation were performed by ABÉTA Ltd.

    Locaton: Budapest, 1st district
    Year of completion: 2020
    Value (net): 920 million HUF
    Abéta, as: construction management and technical supervisor

    Click on the image to open the gallery

  • Renovation of a downtown residential building with attic conversion

    Construction of 11 new, partly two-storey apartments in an attic-ground floor- 3-storey, classicist-style residential building in the middle of the Sas Street in the city center. Moreover, the renovation of the roof, the external and internal facades of the building, the staircase, the hanging corridors, the mechanical and electrical network and the installation of a new elevator. The complete technical supervision of the construction works, which lasted for almost two years, was performed by ABÉTA Ltd.

    Locaton: Budapest, 5th district
    Year of completion: 2020
    Value (net): 620 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Vörösmarty sculpture preservation and exhibition pavilion

    The naming statue of Vörösmarty Square, one of the most visited squares in central Budapest, is wrapped in foil every autumn due to the unfavorable effects of the winter weather. This was substituted in 2019 by the construction of a temporary conservation and show/display pavilion planned for this location. The pavilion was rebuilt in the fall and served as a decoration for the Christmas market. In the spring, it was picked apart and transported to a storehouse until next fall. Both the construction and dismantling works were supervised by ABÉTA Ltd. as a technical supervisor.

    Locaton: Budapest, 5th district
    Year of completion: 2020
    Value (net): –
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • DOOSAN copper foil factory – Környe, Industrial Park of Tatabánya

    The plant, which is a Korean investment, is about 32,000 m2 and produces copper foil for the production of batteries. The greenfield investment included reinforced concrete and steel skeleton industrial halls, a two-story office building, technology buildings and structures, as well as a 132/20 kV electrical receiving and transformer station, an internal utility and a road network, all of which was completely supervised by ABÉTA Ltd. in about 15 months.

    Locaton: Környe
    Year of completion: 2020
    Value (net): 14000 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Complete renovation of the FTC football fields

    During the complete renovation of the 3 standard size grass training fields located in FTC Népliget Sports Center the beds went under a complete replacement and a track heating and irrigation system was installed. Plastic fibers were threaded into the lawn mat to achieve adequate mechanical resistance. In order to achieve an impeccable quality of grass covered play area, a grow lighting equipment was also installed. The renovation was carried out under the technical supervision of ABÉTA Ltd.

    Locaton: Budapest, 10th district
    Year of completion: 2019
    Value (net): 4000 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new fiber extraction plant, waste starch building and boiler house in Dunaföldvár

    In the area of the Dunaföldvár of the corn processing chemical plant, we performed the technical supervision of the implementation of three new technological buildings. We cooperated with the construction of a 4-storey reinforced concrete skeleton fiber extraction plant, the construction of a waste starch utilizing reinforced concrete skeleton building and the installation of a steel skeleton boiler building.

    Locaton: Dunaföldvár
    Year of completion: 2019
    Value (net): 780 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new production hall, office building and social block – Perbál

    At the developer’s site in Perbal, in the next phase of development, a prefabricated reinforced concrete skeleton hall “D” was built on the two complete floors on a total of about 2,400 m2. The two-storey office and social block is located in the main section of the hall. The entire building, including the production areas, is air-conditioned. The complete technical supervision tasks of the implementation were performed by ABÉTA Kft.

    Locaton: Perbál
    Year of completion: 2019
    Value (net): 540 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new production hall, warehouse and office building – Nagytarcsa

    As a greenfield investment, full technical supervision of the construction of a lightweight hall with a steel frame structure of 1100 m2 in the Nagytarcsa Industrial Park.

    Locaton: Industrial Park of Nagytarcsa
    Year of completion: 2019
    Value (net): 320 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of a new chemical factory in Komárom

    Complete technical supervision of the greenfield construction of a new chemical factory in the Industrial Park of Komárom. The factory has a 600 m2 r.c. skeleton office building, a 1300 m2 steel skeleton technological building and a circa 7000 m2 open-air production area. On the plant site 9 big carbon-steel and stainless-steel tanks had been installed, among which the largest are over 1000m3.

    Locaton: Industrial Park of Komárom
    Year of completion: 2019
    Value (net): 1600 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • New apartment complex in Dolmány street

    Complete technical supervision of a new apartment complex with 36 flats (groundfloor + 4 floors) in the 13th district, Budapest. The building has reinforced concrete skeleton and brick filler walls. It also has to underground garage and inner garden.

    Locaton: 40 Dolmány Street, Budapest, 13th district
    Year of completion: 2018
    Value (net): 1100 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Pendula Nursery-school

    Reconstruction of a mansion with a garden to create a nursery-school and a youth center in the 2nd district, Budapest. The building hosts 3 nursery groups, the administrative offices of the foundation and community space for youth aged 8-18 (learning kitchen, gym). The park surrounding the building has been rehabilitated as well.

    Locaton: 18 Hűvösvölgyi Street, Budapest, 2nd district
    Year of completion: 2018
    Value (net): 650 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • NEBU-CHEM warehouse and office building

    Complete technical supervision of the greenfield construction of a 1050 m2 warehouse and an office building in the Industrial Park of Kistarcsa. The building has reinforced concrete skeleton, sandwich-structured walls, insulated PVC sheeted roof, internal RC slabs, industrial floors, complete electrical and mechanical network and a parking lot.

    Locaton: Industrial Park of Kistarcsa
    Year of completion: 2018
    Value (net): 340 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Energy efficiency improvement of FTC Elek Gyula Handball Arena

    Technical supervision of the complete energy efficiency improvement of Ferencvárosi Torna Club’s handball arena, located in Népliget Sportcentrum. The renovated building now has a new, insulated roof, sandwich-structured walls and dryvit-type insulation. All doors and windows werw replaced and the building’s boiler house was fully modernised.

    Locaton: 47/A Kőbányai Street, Budapest, 10th district
    Year of completion: 2018
    Value (net): 700 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Construction of AGC’s warehouse expansion

    Extensive technical supervision and project management of a new, 3200 m2 warehouse expension. Client, AGC Glass Hungary Ltd. is located in the Industrial Park of Tatabánya and is a company specializing in glass manufacturing for the automotive industry.

    Locaton: Industrial Park of Tatabánya, Környe
    Year of completion: 2018
    Value (net): 550 million HUF
    Abéta, as: project manager, technical supervisor

    Click on the image to open the gallery

  • Implementation of a new production hall for LOTTE AM. Hungary

    Complete technical supervision of a new 9.900 m2 production hall in Környe for the 8th largest South Korean company group next to its existing plant. The second factory of LOTTE Advanced Materials Hungary LLC., which produces plastic granules in Hungary, was implemented as a greenfield investment. The production hall was executed by LAKÓGÉP Ltd. in less than 5 months. During construction, the exemplary building organization has greatly contributed to the completion of high quality construction and in record time.

    Locaton: Industrial Park of Tatabánya, Környe
    Year of completion: 2018
    Value (net): 1700 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Renovation and insulation of József Attila Theater’s elevation

    Insulating works and design elevation for theater going under energy efficiency modernization, located in the 13th district, Budapest. In parallel with the theater’s renovation, a new cafe had opened by the theater’s main entrance. Our job was the technical supervision of the construction works.

    Locaton: Budapest, 13th district
    Year of completion: 2017
    Value (net): 85 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • New warehouse and office building

    Extensive technical supervision of a new 2000 m2 warehouse and a 700 m2 office building construction in the Industrial Park of Újpest. Warehouse has reinforced concrete structure, plastic doors and windows, the facade is insulated with sandwich boards, clear height is 12m. It was built with every necessary electrical and mechanical building service system. Office building has 3 floors.

    Locaton: Industrial Park of Újpest, Budapest 4th district
    Year of completion: 2018
    Value (net): 420 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Budapest Bábszínház Kemény Henrik Room

    Technical supervision of the refurbishment works and giving new function for BUDAPEST BÁBSZÍNHÁZ NONPROFIT Ltd.’s rooms located on Budapest VI. district. Vörösmarty street 31. The ‘theater’s purpose was to have a new play and rehearsal room available for 50 people which is named after Henrik Kemény, (famous hungarian puppet actor). The design works were made by ART’O’DOM Ltd.

    Locaton: Budapest VI. district
    Year of completion: 2017
    Value (net): 45 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Refurbishment works of FERENCVÁROSI TORNA CLUB’s swimming pool, hall and dressing rooms

    Technical supervision of the refurbishment works of FERENCVÁROSI TORNA CLUB swimming pool, hall and central dressing rooms and also corridors.

    Locaton: Budapest X. district
    Year of completion: 2017
    Value (net): 300 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Perbál “C” storage hall

    Implementation of a 840 m2 storage hall in a n ew greenfield investment. The construction of the “C” hall is part of further developments of the premises in addition to the existing hall buildings. Inside the storage-function, offices have also been developed.

    Locaton: Perbál
    Year of completion: 2017
    Value (net): 160 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Ecseri Ltd.’s new production hall, relating office builing and social block

    Ecseri Ltd. wanted a new prefabricated reinforced concrete framed, 9 and 6.8 meters clear high, three naves craned, 23.000 m2 production hall, two-storey office and social block building complex as a greenfield investment. “Big-slab” industrial floor constructed through the whole production hall. The two-storey office block elevation has a unique look of ceramic cladding, which in addition to its attractive appearance has beneficial effects to the summer balance of heat as well. We are provided more than 60 car parking spaces in the property and considerable covered bicycle storage.  Other reinforced concrete structures were also built, such as fire water tank and technology waste storage. A steel structured reception building greets the arrivals. The completely Hungarian company’s main profile is production and processing of aluminum castings. Product range typically contains components of the car-, engineering- and electrical industry produced by aluminium pressed die-casting technology. As a result of the investment, 250 new workers can be employed.

    Locaton: Cegléd, Industrial Park
    Year of completion: 2017
    Value (net): 2500 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • New storage hall and office building for Trans-Sped Ltd.

    Complete technical supervision of the implementation of a new 6.000 m2 storage hall and relating office block for the forwarding and transporting Trans-Sped Ltd. The nearly 1 billion forint greenfield investment was built in less than one year in Tatabánya-Környe Industrial Park.

    Locaton: Környe
    Year of completion: 2016
    Value (net): 800 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of the 2nd phase of Eurochamp Ltd.’s new growing hall

    Complete technical supervision of the implementation of a new set of “mushroom houses” for the mushroom growing Eurochamp Ltd. Significant mechanical investment realized in the mushroom houses relating to the growing technology.

    Locaton: Ócsa
    Year of completion: 2016
    Value (net): 250 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Lobby reconstruction works of CENTRAL THEATRE

    Client’s main purpose was to get a modern interior image by the renewal works of the lobby and entrance-hall of the minor stage in the Révay Street. Because of the new intention – to form complete and large space – the existing slab was demolished in the two-storied gallery during the implementation. The construction, which was located in a busy city area, became ready by a strict schedule where continous cooperation was necessary with the Project Members. The result speaks for itself: a new high quality lobby is waiting for the audience.

    Locaton: Budapest VI. district
    Year of completion: 2016
    Value (net): ~100 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of DUNA VITEX Ltd.’s new production and storage hall

    During the new plant expansion project of DUNA VITEX Ltd., a new reinforced concrete and steel mix-structural production hall of 4000 m2 was implemented with the connecting internal roads, parking lots, gardening works and smaller additional operational buildings.

    Locaton: XXII. district of Budapest
    Year of completion: 2016
    Value (net): 800 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • Volán Népliget Traveller Centre and Ceiling Restoration

    The project of the ground floor of the Volánbusz Népliget bus station was constructed a new Traveller Centre. In parallel, the total replacement of the suspended false ceiling was implemented with mechanical equipment replacements and the renovation of electrical systems.

    Locaton: Budapest, Népliget
    Year of completion: 2016
    Value (net): 100 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • MOSAIK SPACE startup office reconstruction

    The reconstruction is placed on the No. 32. Pannonia Street in XIII. district, Budapest in an eclectic building from the beginning of the 19th century. The property had a full of modern interior design and renovation of electrical and a pleasant, well-appointed “startup” office was carried out. The two-story, approximately 800 m2 floor space has independent office spaces, community and lecture spaces, meeting rooms, an internal courtyard and a well-separated apartment.

    Locaton: XIII. district of Budapest
    Year of completion: 2016
    Value (net): 85million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Main entrance and management rooms renovation of the Örkény István Theatre

    Complete technical supervision of the renovation works of the main entrance and management spaces in the Örkény István Theatre. During the implementation, all of the internal rooms gained a new architectural design. Architect designer of the renovation works was Krisztián Vincze (Art’O-Dom)

    Locaton: Budapest VII.
    Year of completion: 2015
    Value (net): 37.5 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • New production and storage hall

    Complete technical supervision of a new 2100 m2 storage hall, social block and two-storey office building. The implementation took place at the premises of PEX Automotive Ltd. part of the PRETTL GROUP manufacturing micro-electronic devices. The project was supported by the EU.

    Locaton: Érd
    Year of completion: 2015
    Value (net): 420 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Production hall extension

    This project was in Esztergom Industrial Zone for Plastimat Hungary Ltd. which produces plastic car parts, we fulfilled technical supervision of the implementation of the new 1200 m2 production hall. The project was supported by the EU.

    Locaton: Esztergom
    Year of completion: 2015
    Value (net): 250 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • Hungarian Folk Art Museum, Art Workshop and Office

    Fulfilling technical supervision next to the existing Hungarian Folk Art Museum exhibition rooms, implementation of a duplex Art Workshop and office building.

    Locaton: Budapest I.
    Year of completion: 2015
    Value (net): 30 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Busch Hungary Ltd. production technology expansion

    Technical supervision of works in Győr, Busch Hungaria Ltd. factory related to technological expansions and developments.

    Locaton: Győr
    Year of completion: 2014
    Value (net): 1600 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Production hall

    In Tatabánya Industrial Zone, for AGC Glass Hungary Kft., which produces special glass structures for the car industry, managing and fulfilling technical supervision for the implementation of the new, 8000 m2 production hall and an office area inside the hall. The project was supported by the EU.

    Locaton: Tatabánya Ipari Park, Környe
    Year of completion: 2014
    Value (net): 1400 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • Implementation of Open-air Stage on Margaret Island, phase III

    At Margaret Island, managing and technical supervising of the renovation and building of the existing and new dressing rooms.

    Locaton: Budapest
    Year of completion: 2014
    Value (net): 96 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • Pesti Theatre auditorium and waterblock reconstruction

    The exchange of the carpet and interior redesign of materials and covers at the area of the Pest Theatre’s auditorium as well as the high quality reconstruction of the waterblocks. During the reconstruction, ABÉTA Kft was responsible for technical supervision.

    Locaton: Budapest
    Year of completion: 2014
    Value (net): 27 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • TEVA Pharmaceutical Company and Lab

    At TEVA’s settlement in Gödöllő, we were managing the contracting of a newly built, two-storey lab house, with special sterilized areas from tendering to technical hand over procedure. At every stage, we were providing technical supervision.

    Locaton: Gödöllő
    Year of completion: 2014
    Value (net): 170 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Margaret Island Open-air Stage and Water tower renewal

    Technical supervision of Margaret Island Open-air Stage and the historic preservation Water Tower renewal. The stage acquired a new, larger canopy cover streched on a greater span steel frame. The 2700 seats of auditorium were exchanged, and the synthetic resin was renewed on the auditorium floor. The toilettes were modernized, and the storage of the water tower was renovated. The reinforced concrete structure of the Water Tower was one of the first built in Hungary. After the needed structural renovations and conservations, the water tower got a new color of paint and floodlight.

    Locaton: Budapest Margitsziget
    Year of completion: 2013
    Value (net): 320 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of „Varázskert” day nursery

    Complete supervison of an up-to-date nursery with 40 children holding capacity in IX. district of Budapest. The project was supported by the EU.

    Locaton: Budapest IX.
    Year of completion: 2013
    Value (net): 350 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • DUNA VITEX office and storage hall expansion

    Complete technical supervision of the implementation of a three-leveled office and storage hall, owned by a german abradant producer company, located in XX. district of Budapest.

    Locaton: Budapest XX.
    Year of completion: 2013
    Value (net): 140 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Demolition of power plant furnace blocks

    At the power plant of Százhalombatta Dunamenti Erőmű, we provided technical supervision of the demolition of the out of order furnace blocks. Built in the 1950’s, the gas heating power plant blocks were insulated with asbestos. That is why the demolition of the plants requires high and special technical and environmental safety by the implementation of an english company, Brown and Mason.

    Locaton: Százhalombatta
    Year of completion: 2013
    Value (net): –
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Renewal of the portal of Pesti Színház

    Renewal of the portal of Pesti Színház, located on Váci street in Budapest.

    Locaton: Perbál
    Year of completion: 2013
    Value (net): 7 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Solar installation for Vígszínház

    Technical supervision of the solar and electrical system installation to the top of the tarnished building of Vígszínház.

    Locaton: Budapest XIII.
    Year of completion: 2013
    Value (net): 24 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of storage hall

    Complete technical supervision of a greenfield implementation in the industrial zone of Kunszentmárton on lightweight, 4500 m2, steel structure.

    Locaton: Kunszentmárton
    Year of completion: 2013
    Value (net): 380 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Implementation of Production hall and office building

    In the industrial zone of Piliscsaba, for the industrial knives producer, EUROKNIFE Bt., managing and fulfilling technical supervision about implementation of crane manufacturing hall, two-leveled office building and storage. The project was carried out with the support of the EU. Firstly, the pre-fabricated reinforced concrete frame was built, and then later in the project, the office and storage was built

    Locaton: Piliscsaba
    Year of completion: 2013
    Value (net): 320 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • Building renovation of the Mayoral Office

    Energy saving renovation of the single-storey building of the Mayoral Office. Heat insulation of all elevations and on the floor slab in the attic was installed as well as the changing of all outdoor doors and windows and the installation of a heat pump system. Project was supported by the EU.

    Locaton: Perbál
    Year of completion: 2011
    Value (net): 44 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • Interior reconstruction of Theatre Radnóti

    General interior and electric reconstruction of the auditorium, artist reception, sound and light controlling, interior staircase of the theatre. Partial renovation of the lobby. It was realized in the summer break.

    Locaton: Budapest, VI.
    Year of completion: 2011
    Value (net): 80 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • MÁK BISTRO RESTRUCTURING

    Restructuring of the previous Restaurant Lou Lou in the city of Budapest. Completion of the interior design, sanitary engineering and electric construction works due to the full change of interior design.

    Locaton: Budapest V.
    Year of completion: 2010
    Value (net): 18 million HUF
    Abéta, as: main contractor

    Click on the image to open the gallery

  • OFFICE BUILDING AND STORAGE HALL

    Project management and technical supervision of a two-storey high store with prefabricated reinforced- concrete frame structure and a four-storey office building, 8800 square meters (94,700 square feet in total). Realization of the project started in September, 2009.

    Locaton: Budapest IX.
    Year of completion: 2010
    Value (net): 1,100 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • OFFICE BUILDING AND STORAGE HALL

    Project management and technical supervision of the implementation of the 450 m2 office building (4840 square feet) with monolithic reinforced-concrete structure, infill brickworks, lightweight steel roof structure, and of an insulated lightweight structure steel storage hall of 300 square meters (3230 square feet). The project was sponsored by the EU.

    Locaton: Nagytacsa
    Year of completion: 2010
    Value (net): 148 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • STORAGE HALL AND OFFICE BUILDING

    General technical supervision of the greenfield investment of a 1050 m2 lightweight structured steel framed, insulated storage building (11,300 square feet), and a three-storey office building with monolith reinforced-concrete frame structure: construction, electric networks , mechanical building service, external public utilities and road construction.

    Locaton: Budapest XVII.
    Year of completion: 2009
    Value (net): 152 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • LOGISTICAL CENTER

    Storage and office building. Heat-insulated, 15,000 m2 (161,500 square feet) logistical hall of pre-fabricated reinforced-concrete frame and an office building with a 1000 m2 built-in area. General technical supervision of the greenfield investment: construction, electric networks, mechanical building service, external public utilities and road construction.

    Locaton: Dunakeszi
    Year of completion: 2009
    Value (net): 1500 million HUF
    Abéta, as: technical supervisor

    Click on the image to open the gallery

  • COVERED RIDING HALLS

    Implementation of two covered riding halls within the manège plant in Perbál, totalling an area of 1400 m2 (15,000 square feet). Wooden structure of roof-trusses of 22 meters (72 feet) span on reinforced-concrete pillar and with tile roofing, roof light windows, brick infill walling, plaster rendering outside, emulsion paint inside.

    Locaton: Perbál
    Year of completion: 2009
    Value (net): 80,2 million HUF
    Abéta, as: main contractor

    Click on the image to open the gallery

  • STORAGE HALL AND OFFICE BUILDING

    The implementation and technical supervision of the connected field-works (public utility, road construction, and gardening) of a heat-insulated storage hall of 2400 m2 (25,800 square feet) with pre-fabricated reinforced concrete framing, and the two-storey office building of 810 m2 (8,700 square feet) with traditional brick masonry and monolith reinforced-concrete structure.

    Locaton: Szigetszentmiklós
    Year of completion: 2008
    Value (net): 420 million HUF
    Abéta, as: project manager and technical supervisor

    Click on the image to open the gallery

  • WASTE TRANSFERAL STATION

    Earthworks of great volume (6000 cubic meters, i.e. 211,888 cubic feet) on a building area on a wooded territory, milled asphalt and concrete pavement with steel hair reinforcement, reinforced-concrete technological structures, mine-shafts, steel covering structures, spatial lighting, public utility supply, landscaping, and construction of fence.

    Locaton: Vácrátót
    Year of completion: 2007
    Value (net): 67.4 million HUF
    Abéta, as: main contractor

    Click on the image to open the gallery

  • STORAGE HALL AND OFFICE BUILDING

    Heat-insulated storage hall of 650 square meters (7000 square feet) of floor area with prefabricated reinforced-concrete framing, steel hair reinforced industrial floor, multi-storied storage shelf system and cold-storage rooms. Two-storey, 350 m2 (3760 square feet) furnished office building with traditional masonry brick structure providing office and social functions space.

    Locaton: Budapest, XVII.
    Year of completion: 2006
    Value (net): 171,4 million HUF
    Abéta, as: main contractor

    Click on the image to open the gallery

  • WASTE RECYCLING HALL

    Light-weight, 1100 m2 (11’840 square feet) steel hall with uninsulated trapezoid sheet walls, roof cover and openable roof fanlights. Steel hair reinforced industrial floor, reinforced-concrete shafts and base-plates, monolith reinforced-concrete firewater storage. mechanical building service electric networks and fire-alarm systems.

    Locaton: Gyál
    Year of completion: 2005
    Value (net): 75 million HUF
    Abéta, as: main contractor

    Click on the image to open the gallery

Get in touch with us

Or call us at +36 30 277-4368